World

Egypt speeds up tie-in of two new wells after promising discoveries

Jan 02, 2026

Cairo [Egypt], January 2: Egypt's Ministry of Petroleum and Mineral Resources announced promising production results following the completion of drilling two new wells in the Western Desert, with initial tests showing a combined natural flow of about 1,650 barrels of crude oil and 19 million cubic feet of gas per day.
The ministry said the two wells - 'Dorra-36' and 'West Yasmine-3' - targeted the 'Khatatba' and 'Masajid' geological formations, using the latest drilling technologies.
It added that technical teams are currently working to accelerate the tie-in of the two wells to existing production facilities, to ensure they enter service as soon as possible and support higher production rates.
Source: Emirates News Agency

More news

Sirolimus-Coated Balloon Matches Drug-Eluting Stent at One Year in Large International TRANSFORM II Trial

Tampa (Florida) [US], November 2: Sirolimus-coated balloon (SCB) strategy was non-inferior to contemporary everolimus-eluting stents (EES) for Target Lesion Failure (TLF) at 12 months in patients with de novo coronary artery disease. These are the results of the TRANSFORM II randomised trial, presented today as a Late-Breaking Clinical Trial at TCT 2026 and accepted in The Lancet which confirm how MagicTouch Sirolimus Coated Balloon (Concept Medical) matches contemporary best in class stent. Late-breaking results presented at TCT 2026 show an implant-free strategy with MagicTouch Sirolimus Coated Balloon is non-inferior to everolimus-eluting in de novo coronary artery disease.

Nov 02, 2026